Skip to content

Test Result : projectroot.app

1 failures (+1) , 7 skipped (-4)
16 tests (-45)
Took 39 sec.

All Failed Tests

Test NameDurationAge
 Build / rocm-ndebug-orange-float / projectroot.app.demo-interactor.app/demo_interactor0.89 sec1

All Tests

ClassDurationFail(diff)Skip(diff)Pass(diff)Total(diff)
celer-g436 sec033-156-15
celer-sim1.3 sec022-104-10
demo-geo-check0 ms02-20-32-5
demo-interactor2.1 sec1+103-114-10